Solar

Gopin Group Becomes New Entrant in India's ALMM-II Solar Cell List

The Gujarat-based manufacturer joins the approved list for solar cells, a step that could ease the country's reliance on imported cells.

By Gagan Sharma · 9 Oct 2026
Representative image: Indian Cove Campground amphitheater and solar panels; Twentynine Palms, CA
Representative image: Indian Cove Campground amphitheater and solar panels; Twentynine Palms, CA Photo: Joshua Tree National Park. Source pdm

Gopin Group has been added to India's Approved List of Models and Manufacturers (ALMM) for solar cells, making the Gujarat company a new entrant in the ALMM-II category. The listing was reported by Saur Energy on October 9, 2026.

ALMM-II covers solar cells, the building blocks of PV modules. The original ALMM list, ALMM-I, applies to finished modules. Both lists are maintained by the Ministry of New and Renewable Energy (MNRE) and govern which products can be used in government-backed and subsidised solar projects.

For a manufacturer, getting on the list is the difference between selling into India's biggest solar demand centres and watching from the sidelines. Domestic content rules tie a large share of public tenders to approved suppliers. Without an ALMM entry, a cell maker can't supply those projects.

Why cells matter more than modules

India has built out module capacity fast. Cell capacity has lagged. Most Indian module lines still run on imported cells, largely from China. That gap is the reason ALMM-II exists and the reason the government has been slow to enforce it.

Adding a Gujarat player to the cell list widens the domestic supplier base. It doesn't solve the shortfall on its own. One entrant is one entrant. But each addition chips at the import dependence that has worried policymakers for years.

Gopin Group's entry also signals that newer manufacturers are clearing the technical and financial checks MNRE requires. Those checks cover manufacturing setup, testing, and quality standards. Passing them takes time and capital.

The policy backdrop

ALMM was introduced to push domestic manufacturing and cut reliance on imports. Enforcement has been phased. Module rules came first. Cell rules have moved more slowly, with deadlines shifted more than once as developers warned of supply shortages and cost spikes.

That tension hasn't gone away. Developers want cheap, abundant cells. Domestic makers want protection and demand. ALMM-II sits right in the middle of that fight.

For now, the list is what it is: a roster of approved cell suppliers. Gopin Group is on it. The company can now bid for projects that require domestic cells.

The broader question, whether India's cell capacity can keep pace with its module lines and its installation targets, stays open. Every new name on the list is a data point. One more name doesn't settle the argument.

Source: Saur Energy · 9 Oct 2026

Comments

Be the first to comment.

Leave a comment